UA-55300619-1

Zimbabwe braces up for increased loadshedding, as Kariba repairs resume

Filed under: Breaking News |
353 Views

The Zimbabwe Electricity Supply Authority ZESA has warninged of “reduced (power) generation levels” after work resumed at Kariba to repair the dam wall.

The power utility says this will result in “load curtailment” also known as power cuts.

Zimbabwe has power shortages and is currently importing from Zambia and Mozambique.

Facebooktwitterredditpinterestlinkedinmail

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.